CARE SECTOR CASE STUDY

Multi site care home fit out programme

A coordinated programme of complete fit outs delivered across several care homes for an established UK operator.

Completed care home servery with bespoke cabinetry and illuminated shelving

SECTORCare and later living

PROJECT TYPEMulti site fit out programme

SCOPEComplete interior delivery

ENVIRONMENTOperational care homes

Project note

The images shown were taken across several care homes for the same established operator. The client and individual homes remain anonymous.

THE BRIEF

Deliver consistent, high quality interiors across several live care environments.

These photographs represent work completed across multiple care homes rather than a single building. The operator required a dependable delivery team capable of translating individual design schemes into practical, durable environments.

Wilo carried out the full fit outs, coordinating site works, specialist trades, finishes, bespoke furniture and final installation around the needs of each home.

SCOPE DELIVERED

  • Site surveys and programme planning
  • Strip out, preparation and general building works
  • Mechanical, electrical and lighting coordination
  • Flooring, decorating and interior finishes
  • Bespoke bedroom furniture and fitted storage
  • Reception desks, serveries and tea stations
  • Communal lounge joinery and media walls
  • Snagging, finishing and handover

THE RESULT

A repeatable delivery model with each home retaining its own character.

The completed programme combines consistent build quality with interiors designed around the residents, staff and daily operation of each individual home.

Planning improvements across one care home or several sites?

Share the locations, intended scope and programme to start a practical conversation.

Email your project details07540 697532View more projects